ScholarGate
Asistent

Porovnať metódy

Prezrite si vybrané metódy vedľa seba; riadky, ktoré sa líšia, sú zvýraznené.

Valuation Studies Method×Infrastructure Studies×
OdborScience Technology StudiesScience Technology Studies
RodinaProcess / pipelineProcess / pipeline
Rok vzniku20131996
TvorcaClaes-Fredrik Helgesson, Fabian Muniesa, Michèle LamontSusan Leigh Star, Geoffrey Bowker, Karen Ruhleder
TypPractice-oriented method for studying valuationQualitative method for studying relational infrastructure
Pôvodný zdrojHelgesson, C.-F., & Muniesa, F. (2013). For what it's worth: an introduction to valuation studies. Valuation Studies, 1(1), 1-10. DOI ↗Star, S. L., & Ruhleder, K. (1996). Steps toward an ecology of infrastructure: design and access for large information spaces. Information Systems Research, 7(1), 111-134. DOI ↗
Ďalšie názvySociology of valuation, Valography, Study of evaluation practicesInfrastructural inversion, Ecology of infrastructure, Study of boundary objects
Príbuzné44
ZhrnutieThe valuation studies method treats valuation—the production, measurement, ordering, and contestation of worth—as a social practice to be studied empirically rather than a hidden mental act or a settled economic fact. Consolidated by Claes-Fredrik Helgesson and Fabian Muniesa and complemented by Michèle Lamont's comparative sociology of valuation and evaluation, it follows how rankings, metrics, prices, and evaluation procedures actually do their work, and asks how worth comes to be, by whom, with which devices, and to what effect.The infrastructure studies method, developed by Susan Leigh Star, Geoffrey Bowker, and Karen Ruhleder, studies the normally invisible relational systems—standards, classifications, pipes, protocols, and installed bases—on which modern life silently depends. Its signature move is 'infrastructural inversion': deliberately foregrounding the background, treating the taken-for-granted substrate as the object of analysis, and reading its standards, classifications, and breakdowns to understand how it shapes work, knowledge, and lives.
ScholarGateDátová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 2 Zdroje
  3. PUBLISHED

Prejsť na hľadanie Stiahnuť snímky

ScholarGatePorovnať metódy: Valuation Studies Method · Infrastructure Studies. Získané 2026-06-24 z https://scholargate.app/sk/compare