ScholarGate
Asistent

Porovnať metódy

Prezrite si vybrané metódy vedľa seba; riadky, ktoré sa líšia, sú zvýraznené.

Optimalizácia rozloženia komôr×Algoritmus Lerchsa-Grossmanna×
OdborBaníctvoBaníctvo
RodinaProcess / pipelineProcess / pipeline
Rok vzniku19601965
TvorcaMining Engineering PracticeHelmut Lerchs and Israel Grossmann
TypOptimization framework for underground mine excavation designGraph-theoretic algorithm for pit limit optimization
Pôvodný zdrojBrady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗
Ďalšie názvyStope Design, Underground Mine Layout, Panel DesignLerchs-Grossmann Method, LG Algorithm
Príbuzné34
ZhrnutieStope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.
ScholarGateDátová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 2 Zdroje
  3. PUBLISHED

Prejsť na hľadanie Stiahnuť snímky

ScholarGatePorovnať metódy: Stope Layout · Lerchs-Grossmann Algorithm. Získané 2026-06-17 z https://scholargate.app/sk/compare