ScholarGate
Asistent

Porovnať metódy

Prezrite si vybrané metódy vedľa seba; riadky, ktoré sa líšia, sú zvýraznené.

Algoritmus Lerchsa-Grossmanna×Optimalizácia rozloženia komôr×
OdborBaníctvoBaníctvo
RodinaProcess / pipelineProcess / pipeline
Rok vzniku19651960
TvorcaHelmut Lerchs and Israel GrossmannMining Engineering Practice
TypGraph-theoretic algorithm for pit limit optimizationOptimization framework for underground mine excavation design
Pôvodný zdrojLerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
Ďalšie názvyLerchs-Grossmann Method, LG AlgorithmStope Design, Underground Mine Layout, Panel Design
Príbuzné43
ZhrnutieThe Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateDátová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 2 Zdroje
  3. PUBLISHED

Prejsť na hľadanie Stiahnuť snímky

ScholarGatePorovnať metódy: Lerchs-Grossmann Algorithm · Stope Layout. Získané 2026-06-17 z https://scholargate.app/sk/compare