ScholarGate
Asistent

Porovnať metódy

Prezrite si vybrané metódy vedľa seba; riadky, ktoré sa líšia, sú zvýraznené.

Komplexné proporcionálne hodnotenie×Systém merania dopadu kritérií×
OdborRozhodovanieRozhodovanie
RodinaMCDMMCDM
Rok vzniku19962025
TvorcaZavadskas, E. K., Kaklauskas, A.Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N.
TypProportional assessment (benefit/cost split)Impact-based weighted scoring (criterion-level deviation analysis)
Pôvodný zdrojZavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. (2025). A New Criteria Importance Assessment (CIMAS) Method in Multi-Criteria Group Decision-Making: Criteria Evaluation for Supplier Selection. FACTA UNIVERSITATIS — Series: Mechanical Engineering DOI ↗
Ďalšie názvy
Príbuzné88
ZhrnutieCOPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.CIMAS (Criterion Impact MeAsurement System) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. in 2025. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateDátová sada
  1. v1
  2. 1 Zdroje
  3. PUBLISHED
  1. v1
  2. 1 Zdroje
  3. PUBLISHED

Prejsť na hľadanie Stiahnuť snímky

ScholarGatePorovnať metódy: COPRAS · CIMAS. Získané 2026-06-17 z https://scholargate.app/sk/compare