ScholarGate
Asistent

Compară metode

Examinează metodele selectate una lângă alta; rândurile care diferă sunt evidențiate.

Algoritmul Lerchs-Grossmann×Ventilația minieră×Algoritmul Pseudoflow×
DomeniuInginerie minierăInginerie minierăInginerie minieră
FamilieProcess / pipelineProcess / pipelineProcess / pipeline
Anul apariției196518801992
Autorul originalHelmut Lerchs and Israel GrossmannMining Engineering PracticeDorit S. Hochbaum
TipGraph-theoretic algorithm for pit limit optimizationSystem design for safe air quality and worker cooling in underground minesEfficient algorithm for maximum closure problem
Sursa seminalăLerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Hartman, H. L., Mutmansky, J. M., Ramani, R. V., & Wang, Y. J. (2012). Mine ventilation and ambient air quality. Society for Mining, Metallurgy & Exploration, Inc. link ↗Hochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗
Denumiri alternativeLerchs-Grossmann Method, LG AlgorithmUnderground Mine Ventilation, Air Flow Design, Mine Haulage VentilationPseudoflow Algorithm, Hochbaum Algorithm
Înrudite433
RezumatThe Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.Mine ventilation is the design and operation of systems that deliver fresh air to underground mining areas and remove contaminated air, heat, and hazardous gases. It is critical for worker safety and productivity, maintaining breathable air (sufficient oxygen, low dust and gas concentrations) and acceptable temperatures. Proper ventilation design requires calculating heat loads from mining operations, determining required air volumes, and designing shaft/drift geometry to deliver adequate flow.The Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.
ScholarGateSet de date
  1. v1
  2. 2 Surse
  3. PUBLISHED
  1. v1
  2. 2 Surse
  3. PUBLISHED
  1. v1
  2. 2 Surse
  3. PUBLISHED

Mergi la căutare Descarcă prezentarea

ScholarGateCompară metode: Lerchs-Grossmann Algorithm · Mine Ventilation · Pseudoflow. Preluat la 2026-06-18 de pe https://scholargate.app/ro/compare