ScholarGate
Asistent

Compară metode

Examinează metodele selectate una lângă alta; rândurile care diferă sunt evidențiate.

Kanban×Planificare Agregată×SMED×
DomeniuManagementul operațiunilorManagementul operațiunilorManagementul operațiunilor
FamilieMachine learningMachine learningMachine learning
Anul apariției195019921985
Autorul originalTaiichi OhnoWallace, T. F.Shigeo Shingo
TipProduction control systemDemand-supply planning frameworkSetup time reduction technique
Sursa seminalăOhno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Wallace, T. F. (1992). Sales & Operations Planning: The how-to handbook. Cincinnati: APICS Publications. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
Denumiri alternativevisual management, pull systemsales and operations planning, production planningquick changeover, rapid setup
Înrudite555
RezumatKanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Aggregate Planning (or Sales & Operations Planning, S&OP) is a collaborative, iterative process that balances demand and supply at a high level—typically grouping products into families and planning over a 3–18 month horizon. Developed formally by Tom Wallace and popularized through APICS, aggregate planning helps organizations align sales forecasts, production capacity, inventory, and workforce to meet demand efficiently while managing costs. It serves as the bridge between strategic business plans and detailed operational execution.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateSet de date
  1. v1
  2. 2 Surse
  3. PUBLISHED
  1. v1
  2. 2 Surse
  3. PUBLISHED
  1. v1
  2. 2 Surse
  3. PUBLISHED

Mergi la căutare Descarcă prezentarea

ScholarGateCompară metode: Kanban · Aggregate Planning · SMED. Preluat la 2026-06-19 de pe https://scholargate.app/ro/compare