ScholarGate
Asistent

Compară metode

Examinează metodele selectate una lângă alta; rândurile care diferă sunt evidențiate.

Programarea atelierului de producție×Planificarea Cerințelor de Materiale×
DomeniuManagementul operațiunilorManagementul operațiunilor
FamilieMachine learningMachine learning
Anul apariției20161975
Autorul originalPinedo, M. L.Joseph Orlicky
TipCombinatorial scheduling problemMaterial planning algorithm
Sursa seminalăPinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗
Denumiri alternativejob scheduling, machine schedulingMRP, MRP I
Înrudite55
RezumatJob shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
ScholarGateSet de date
  1. v1
  2. 2 Surse
  3. PUBLISHED
  1. v1
  2. 2 Surse
  3. PUBLISHED

Mergi la căutare Descarcă prezentarea

ScholarGateCompară metode: Job Shop Scheduling · Material Requirements Planning. Preluat la 2026-06-19 de pe https://scholargate.app/ro/compare