ScholarGate
Asistent

Compară metode

Examinează metodele selectate una lângă alta; rândurile care diferă sunt evidențiate.

Diagrama de Control CUSUM×Analiză Secvențială (Design Grupal Secvențial)×
DomeniuStatisticăStatistică
FamilieProcess / pipelineHypothesis test
Anul apariției19541977
Autorul originalE. S. PageP. C. O'Brien & T. R. Fleming; P. C. Pocock
TipStatistical process control chart for small shiftsSequential / adaptive hypothesis test
Sursa seminalăPage, E. S. (1954). Continuous inspection schemes. Biometrika, 41(1/2), 100–115. DOI ↗O'Brien, P.C. & Fleming, T.R. (1979). A Multiple Testing Procedure for Clinical Trials. Biometrics, 35(3), 549–556. DOI ↗
Denumiri alternativecumulative sum chart, CUSUM control chart, Page's CUSUM, kümülatif toplam kontrol kartısequential testing, group sequential design, interim analysis, Sıralı Analiz (Sequential Testing / Group Sequential Design)
Înrudite45
RezumatThe cumulative sum (CUSUM) control chart, introduced by E. S. Page in 1954, monitors a process by accumulating the deviations of observations from a target value rather than judging each point in isolation. Because small persistent shifts add up over time, the running sum makes them visible far sooner than a Shewhart chart, making CUSUM the tool of choice for detecting small, sustained changes in the process mean.Sequential analysis is a framework for conducting hypothesis tests with pre-planned interim looks at accumulating data, allowing a study to stop early for efficacy or futility while controlling the overall Type I error rate. The group sequential approach was formalised by Pocock (1977) and O'Brien and Fleming (1979), and remains the standard for confirmatory clinical trials and rigorous A/B experiments.
ScholarGateSet de date
  1. v1
  2. 2 Surse
  3. PUBLISHED
  1. v1
  2. 2 Surse
  3. PUBLISHED

Mergi la căutare Download slides

ScholarGateCompară metode: CUSUM Chart · Sequential Analysis. Preluat la 2026-06-15 de pe https://scholargate.app/ro/compare