ScholarGate
Assistente

Comparar métodos

Examine os métodos selecionados lado a lado; as linhas que diferem ficam destacadas.

Gestão de Águas Pluviais×Avaliação de Impacto Ambiental×
ÁreaEngenharia ambientalEngenharia ambiental
FamíliaProcess / pipelineProcess / pipeline
Ano de origem19801970
Autor originalUrban hydrologists and engineersU.S. National Environmental Policy Act (NEPA)
Tipodesign and simulation pipelinesystematic assessment and decision-support pipeline
Fonte seminalUrbonas, B., & Stahre, P. (1993). Stormwater Best Management Practices and Detention. Prentice Hall. ISBN: 978-0134445915Glasson, J., Therivel, R., & Chadwick, A. (2005). Introduction to Environmental Impact Assessment (3rd ed.). Routledge. ISBN: 978-0415303910
Outros nomesurban stormwater, runoff management, wet weather control, low-impact developmentEIA, impact assessment, environmental screening, cumulative effects assessment
Relacionados34
ResumoStormwater management is the planning and engineering of urban water systems to control, treat, and utilize rainwater runoff from developed areas. Traditional approaches (pipes, detention basins) conveyed runoff rapidly to streams or treatment plants; modern green infrastructure approaches (permeable pavements, bioswales, retention ponds) reduce runoff volume through infiltration and reuse while improving water quality. Stormwater management integrates hydrologic modeling, water quality assessment, and infrastructure design to meet regulatory requirements and climate resilience goals.Environmental Impact Assessment (EIA) is a systematic, structured process to identify, predict, and evaluate the environmental and social consequences of proposed development projects (infrastructure, extraction, manufacturing) before implementation. Mandated by law in most jurisdictions since the 1970s (NEPA in USA, EU Directive 2011/92/EU), EIA integrates scientific analysis of air quality, water resources, biodiversity, noise, and socioeconomic effects with stakeholder consultation and decision-making frameworks to inform project approval, design modification, or rejection.
ScholarGateConjunto de dados
  1. v1
  2. 3 Fontes
  3. PUBLISHED
  1. v1
  2. 3 Fontes
  3. PUBLISHED

Ir para a pesquisa Baixar slides

ScholarGateComparar métodos: Stormwater Management · Environmental Impact Assessment. Recuperado em 2026-06-19 de https://scholargate.app/pt/compare