SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Kilderegister
Siteringer kopiert ordrett fra metodens kilderegister. Ingen påstandsnivåverifisering er underforstått fra dem.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Kuraterte påstander
Påstander lagret i bevishovedboken, hver med sin egen vurdering.
Denne visningen finner ikke opp en påstandsvurdering når hovedboken ikke har noen.
Relaterte metoder
Generert fra metodegrafen og vist som maskinforslåtte relasjoner – ingen bevispåstand er underforstått.