ScholarGate
Assistent

Sammenlign metoder

Gjennomgå de valgte metodene side om side; rader som avviker, er uthevet.

Lineær maks normalisering×Kompleks proporsjonal vurdering×
FagfeltBeslutningstakingBeslutningstaking
FamilieMCDMMCDM
Opprinnelsesår19671996
OpphavspersonFishburn, P. C.Zavadskas, E. K., Kaklauskas, A.
TypeNormalization (linear-max, ratio-based)Proportional assessment (benefit/cost split)
Opprinnelig kildeFishburn, P. C. (1967). Additive Utilities with Incomplete Product Sets: Application to Priorities and Assignments. Operations Research DOI ↗Zavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗
Alias
Relaterte48
SammendragLINEAR-MAX-NORMALIZATION (Linear Max Normalization — division by column maximum (benefit) or column minimum over value (cost)) is a normalization multi-criteria decision-making (MCDM) method introduced by Fishburn, P. C. in 1967. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.COPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateDatasett
  1. v1
  2. 1 Kilder
  3. PUBLISHED
  1. v1
  2. 1 Kilder
  3. PUBLISHED

Gå til søk Last ned lysbilder

ScholarGateSammenlign metoder: LINEAR-MAX-NORMALIZATION · COPRAS. Hentet 2026-06-15 fra https://scholargate.app/no/compare