SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Bronrecord
Citaten letterlijk overgenomen uit het bronrecord van de methode. Hieruit wordt geen verificatie op claimniveau afgeleid.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Gecureerde claims
Claims opgeslagen in het bewijsregister, elk met zijn eigen beoordeling.
Deze weergave verzint geen claimbeoordeling als het register er geen heeft.
Gerelateerde methoden
Gegenereerd uit de methodegraaf en getoond als machinaal voorgestelde relaties — er wordt geen bewijsclaim afgeleid.