Bandingkan kaedah
Semak kaedah pilihan anda secara bersebelahan; baris yang berbeza akan diserlahkan.
| Model Pembetulan Ralat Vektor Bayesian (Bayesian VECM)× | Model Pembetulan Ralat Vektor (VECM)× | |
|---|---|---|
| Bidang | Ekonometrik | Ekonometrik |
| Keluarga | Regression model | Regression model |
| Tahun asal≠ | 2002–2005 | 1987 |
| Pengasas≠ | Kleibergen & Paap; Villani | Robert F. Engle and Clive W. J. Granger |
| Jenis≠ | Bayesian multivariate time series model | Multivariate time-series model |
| Sumber perintis≠ | Kleibergen, F., & Paap, R. (2002). Priors, posteriors and Bayes factors for a Bayesian analysis of cointegration. Journal of Econometrics, 111(2), 223–249. DOI ↗ | Engle, R. F., & Granger, C. W. J. (1987). Co-integration and error correction: Representation, estimation, and testing. Econometrica, 55(2), 251–276. DOI ↗ |
| Alias | Bayesian VECM, B-VECM, Bayesian cointegrated VAR, Bayesian vector error correction | VECM, error correction VAR, cointegrated VAR, vector equilibrium correction model |
| Berkaitan | 5 | 5 |
| Ringkasan≠ | The Bayesian VECM combines the classical Vector Error Correction Model — which captures both short-run dynamics and long-run cointegrating relationships among non-stationary multivariate time series — with Bayesian prior distributions over the cointegrating rank and coefficient matrices. This allows principled uncertainty quantification, incorporation of economic theory as priors, and coherent inference even in small samples. | The Vector Error Correction Model extends the Vector Autoregression (VAR) framework to a system of variables that share one or more long-run equilibrium relationships. It jointly models short-run dynamics and the speed at which each variable corrects back toward equilibrium after a shock, making it the standard tool for analysing cointegrated multivariate time series. |
| ScholarGateSet data ↗ |
|
|