Multi-period Interrupted Time Series
Multi-period Interrupted Time Series (MITS) extends the classic ITS framework to settings where two or more interventions occur at known time points within the same series. By fitting a segmented regression with multiple breakpoints, MITS estimates the level change and slope change attributable to each intervention while controlling for the underlying secular trend and for the effects of earlier interruptions.
Avota reģistrs
Atsauces kopētas tieši no metodes avota reģistra. Tās nenozīmē nekādu apgalvojumu līmeņa verifikāciju.
- Kontopantelis, E., Doran, T., Springate, D. A., Buchan, I., & Reeves, D. (2015). Regression based quasi-experimental approach when randomisation is not an option: interrupted time series analysis. BMJ, 350, h2750. · DOI 10.1136/bmj.h2750
- Bernal, J. L., Cummins, S., & Gasparrini, A. (2017). Interrupted time series regression for the evaluation of public health interventions: a tutorial. International Journal of Epidemiology, 46(1), 348-355. · DOI 10.1093/ije/dyw098
Kurēti apgalvojumi
Apgalvojumi saglabāti pierādījumu reģistrā, katram ar savu novērtējumu.
Šis skatījums neizgudro apgalvojumu novērtējumu, ja reģistrā tā nav.
Saistītās metodes
Ģenerēts no metodes grafika un parādīts kā mašīnas ieteiktas attiecības — netiek izvirzīts neviens pierādījumu apgalvojums.