ScholarGate
Asistents

Salīdzināt metodes

Apskatiet izvēlētās metodes blakus; rindas, kas atšķiras, ir izceltas.

Lerchs-Grossmanna algoritms×Optimizācija pazemes izstrāžu izkārtojumam×
NozareKalnrūpniecības inženierijaKalnrūpniecības inženierija
SaimeProcess / pipelineProcess / pipeline
Izcelsmes gads19651960
AutorsHelmut Lerchs and Israel GrossmannMining Engineering Practice
TipsGraph-theoretic algorithm for pit limit optimizationOptimization framework for underground mine excavation design
PirmavotsLerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
Citi nosaukumiLerchs-Grossmann Method, LG AlgorithmStope Design, Underground Mine Layout, Panel Design
Saistītās43
KopsavilkumsThe Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateDatu kopa
  1. v1
  2. 2 Avoti
  3. PUBLISHED
  1. v1
  2. 2 Avoti
  3. PUBLISHED

Doties uz meklēšanu Lejupielādēt slaidus

ScholarGateSalīdzināt metodes: Lerchs-Grossmann Algorithm · Stope Layout. Izgūts 2026-06-17 no https://scholargate.app/lv/compare