방법 증거 기록
SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
원본 기록
방법의 원본 기록에서 그대로 복사된 인용입니다. 이로부터 수준별 검증이 추론되지 않습니다.
Single Minute Exchange of Die
분류학적 방법 기록 · ml-model / operations-management
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
큐레이션된 주장
각각 자체 평가와 함께 증거 원장에 유지된 주장입니다.
아직 큐레이션된 주장이 없습니다
원장에 주장 평가가 없는 경우 이 보기에서는 주장 평가를 만들지 않습니다.
관련 방법
방법 그래프에서 생성되었으며 기계가 제안한 관계로 표시됩니다 — 증거 주장이 추론되지 않습니다.