Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
원본 기록
방법의 원본 기록에서 그대로 복사된 인용입니다. 이로부터 수준별 검증이 추론되지 않습니다.
Risk-based Statistical Process Control Chart
분류학적 방법 기록 · process-pipeline / experimental-design
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
큐레이션된 주장
각각 자체 평가와 함께 증거 원장에 유지된 주장입니다.
아직 큐레이션된 주장이 없습니다
원장에 주장 평가가 없는 경우 이 보기에서는 주장 평가를 만들지 않습니다.
관련 방법
방법 그래프에서 생성되었으며 기계가 제안한 관계로 표시됩니다 — 증거 주장이 추론되지 않습니다.