ScholarGate
アシスタント

手法を比較

選択した手法を並べて確認できます。異なる行はハイライト表示されます。

最適潮流計算×ニュートン・ラプソン電力潮流計算×Unit Commitment×
分野電気工学電気工学電気工学
系統Process / pipelineProcess / pipelineProcess / pipeline
提唱年196219671959
提唱者Jean CarpentierWilliam F. Tinney, Charles E. HartCharles J. Baldwin
種類Nonlinear constrained optimization for power system operationIterative solution algorithm for power system steady-state analysisCombinatorial optimization for generator turn-on/turn-off scheduling
原典Carpentier, J. (1962). Contribution à l'étude du dispatching économique. Bulletin de la Société Française des Électriciens, 8(3), 431-447. link ↗Tinney, W. F., & Hart, C. E. (1967). Power flow solution by Newton's method. IEEE Transactions on Power Apparatus and Systems, 86(11), 1449-1460. DOI ↗Baldwin, C. J., Dale, K. M., & Dittrich, R. F. (1959). A study of the economic shutdown of generating units in daily dispatch. AIEE Transactions, 78(3), 272-282. link ↗
別名OPF, Economic Dispatch with ConstraintsNR Power Flow, Newton-Raphson Load FlowUC, Generator Commitment, Thermal Unit Scheduling
関連333
概要Optimal Power Flow (OPF) is a fundamental optimization framework for computing the most economical and secure operating point of an electrical power system. Introduced by Jean Carpentier in 1962, OPF minimizes operational costs (fuel, losses, or other expenses) while satisfying physical and operational constraints. Modern electric grids depend on OPF for real-time economic dispatch, security analysis, and planning, making it one of the most important problems in power systems engineering.The Newton-Raphson method is a powerful iterative technique for solving the nonlinear power flow equations in electrical power systems. Introduced by Tinney and Hart in 1967, it became the industry standard for computing steady-state voltage and power distributions across transmission networks. The method uses Jacobian matrix formulations to rapidly converge to the true operating point.Unit Commitment (UC) is the problem of deciding which power generation units should be switched on or off over a planning horizon (typically 24-168 hours) to minimize total operating cost while meeting demand and reserve requirements. Introduced by Baldwin et al. in 1959, UC is a fundamental scheduling problem in power system operations, combining combinatorial optimization (which units to commit) with continuous optimization (optimal power output). UC remains one of the most important and computationally challenging problems in power systems.
ScholarGateデータセット
  1. v1
  2. 3 出典
  3. PUBLISHED
  1. v1
  2. 3 出典
  3. PUBLISHED
  1. v1
  2. 3 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Optimal Power Flow · Newton-Raphson Power Flow · Unit Commitment. 2026-06-18に以下より取得 https://scholargate.app/ja/compare