経済的負荷配分×高速解連電力潮流計算 (Fast Decoupled Power Flow)×Unit Commitment×
分野電気工学電気工学電気工学
系統Process / pipelineProcess / pipelineProcess / pipeline
提唱年195819721959
提唱者Lester K. KirchmayerBrian Stott, Octave AlsacCharles J. Baldwin
種類Continuous optimization for allocating power output among committed generatorsDecoupled iterative solution method for power system analysisCombinatorial optimization for generator turn-on/turn-off scheduling
原典Kirchmayer, L. K. (1958). Economic Operation of Power Systems. Wiley & Sons. link ↗Stott, B., & Alsac, O. (1972). Fast decoupled load flow. IEEE Transactions on Power Apparatus and Systems, 91(3), 859-869. link ↗Baldwin, C. J., Dale, K. M., & Dittrich, R. F. (1959). A study of the economic shutdown of generating units in daily dispatch. AIEE Transactions, 78(3), 272-282. link ↗
別名ED, Least-Cost Generation DispatchFDLF, Fast Decoupled Load FlowUC, Generator Commitment, Thermal Unit Scheduling
関連333
概要Economic Dispatch (ED) is the process of optimally allocating power output among committed generators to meet demand at minimum fuel cost. Introduced by Kirchmayer in 1958, ED is a fundamental real-time optimization problem solved every few minutes in power system operations. Unlike Unit Commitment (which decides generator on/off), ED assumes generators are already committed and focuses on splitting load most economically. ED's rapid feedback enables efficient real-time power plant operations.The Fast Decoupled Load Flow (FDLF) method, introduced by Stott and Alsac in 1972, exploits the weak coupling between active and reactive power in power systems to accelerate convergence beyond standard Newton-Raphson. By decoupling the equations and using constant, approximate Jacobians, it reduces computation per iteration while maintaining acceptable accuracy for most practical systems. This method remains widely used in operational software for its speed and numerical stability.Unit Commitment (UC) is the problem of deciding which power generation units should be switched on or off over a planning horizon (typically 24-168 hours) to minimize total operating cost while meeting demand and reserve requirements. Introduced by Baldwin et al. in 1959, UC is a fundamental scheduling problem in power system operations, combining combinatorial optimization (which units to commit) with continuous optimization (optimal power output). UC remains one of the most important and computationally challenging problems in power systems.
ScholarGateデータセット
  1. v1
  2. 3 出典
  3. PUBLISHED
  1. v1
  2. 3 出典
  3. PUBLISHED
  1. v1
  2. 3 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Economic Dispatch · Fast Decoupled Power Flow · Unit Commitment. 2026-06-18に以下より取得 https://scholargate.app/ja/compare