ScholarGate
アシスタント

手法を比較

選択した手法を並べて確認できます。異なる行はハイライト表示されます。

制約プログラミング×動的計画法×整数計画法×
分野最適化最適化最適化
系統Process / pipelineProcess / pipelineProcess / pipeline
提唱年200619571958
提唱者Rossi, van Beek & WalshRichard BellmanRalph Gomory (cutting planes, 1958); land-and-doig branch-and-bound (1960)
種類Declarative combinatorial optimizationExact combinatorial optimization via recursive decompositionMathematical optimisation — exact combinatorial method
原典Rossi, F., van Beek, P., & Walsh, T. (Eds.). (2006). Handbook of Constraint Programming. Elsevier. ISBN: 978-0-444-52726-4Bellman, R. (1957). Dynamic Programming. Princeton University Press. ISBN: 978-0-691-07951-6Wolsey, L.A. (1998). Integer Programming. Wiley. ISBN: 9780471283669
別名Constraint Satisfaction Programming, Constraint-Based Optimization, Kısıt Programlama, CSP OptimizationDP, Bellman's Principle of Optimality, Recursive Optimization, Dinamik ProgramlamaIP, MIP, mixed-integer programming, mixed-integer linear programming
関連334
概要Constraint Programming (CP) is a declarative optimization paradigm in which a problem is formulated as a set of variables, finite domains, and constraints, and a solver systematically searches for assignments that satisfy all constraints. Formalized comprehensively by Rossi, van Beek, and Walsh in their 2006 Handbook of Constraint Programming, CP unifies propagation-based pruning with intelligent backtracking search to tackle combinatorial problems across scheduling, planning, and configuration domains.Dynamic Programming (DP) is an exact optimization technique introduced by Richard Bellman in 1957 for solving multi-stage decision problems. It decomposes a complex problem into simpler, overlapping subproblems, solves each subproblem once, and stores the results to avoid redundant computation. Grounded in the Principle of Optimality, DP guarantees globally optimal solutions whenever the problem exhibits overlapping subproblems and optimal substructure.Integer programming (IP), also called mixed-integer programming (MIP) when only some variables are restricted to whole numbers, is a branch of mathematical optimisation in which some or all decision variables must take integer or binary values. Building on linear programming, it was formalised through Ralph Gomory's cutting-plane method (1958) and the Land-and-Doig branch-and-bound algorithm (1960), and it has since become the standard exact framework for scheduling, assignment, routing, and resource-allocation problems.
ScholarGateデータセット
  1. v1
  2. 1 出典
  3. PUBLISHED
  1. v1
  2. 1 出典
  3. PUBLISHED
  1. v1
  2. 2 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Constraint Programming · Dynamic Programming · Integer Programming. 2026-06-15に以下より取得 https://scholargate.app/ja/compare