ScholarGate
アシスタント

手法を比較

選択した手法を並べて確認できます。異なる行はハイライト表示されます。

ボンド・ワーク・インデックス×Lerchs-Grossmann アルゴリズム×擬似フローアルゴリズム×
分野鉱山工学鉱山工学鉱山工学
系統Process / pipelineProcess / pipelineProcess / pipeline
提唱年195219651992
提唱者Fred C. BondHelmut Lerchs and Israel GrossmannDorit S. Hochbaum
種類Empirical method for grinding energy estimationGraph-theoretic algorithm for pit limit optimizationEfficient algorithm for maximum closure problem
原典Bond, F. C. (1952). The third theory of comminution. Transactions of the American Institute of Mining and Metallurgical Engineers, 193, 484-494. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Hochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗
別名Bond Work Index, BWI, Bond Index TestLerchs-Grossmann Method, LG AlgorithmPseudoflow Algorithm, Hochbaum Algorithm
関連343
概要The Bond Work Index, introduced by Fred C. Bond in 1952, is an empirical parameter that characterizes the resistance of an ore to grinding in a tumbling mill. It is defined as the kilowatt-hours per short ton (kWh/st) of electrical energy required to reduce a coarse ore from theoretically infinite size to 80% passing 100 micrometers. The Bond Index is foundational in mineral processing plant design and cost estimation worldwide.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.The Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.
ScholarGateデータセット
  1. v1
  2. 2 出典
  3. PUBLISHED
  1. v1
  2. 2 出典
  3. PUBLISHED
  1. v1
  2. 2 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Bond Work Index · Lerchs-Grossmann Algorithm · Pseudoflow. 2026-06-18に以下より取得 https://scholargate.app/ja/compare