Ventilazione Mineraria×Algoritmo Pseudoflow×Ottimizzazione del layout delle cave sotterranee×
CampoIngegneria minerariaIngegneria minerariaIngegneria mineraria
FamigliaProcess / pipelineProcess / pipelineProcess / pipeline
Anno di origine188019921960
IdeatoreMining Engineering PracticeDorit S. HochbaumMining Engineering Practice
TipoSystem design for safe air quality and worker cooling in underground minesEfficient algorithm for maximum closure problemOptimization framework for underground mine excavation design
Fonte seminaleHartman, H. L., Mutmansky, J. M., Ramani, R. V., & Wang, Y. J. (2012). Mine ventilation and ambient air quality. Society for Mining, Metallurgy & Exploration, Inc. link ↗Hochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
AliasUnderground Mine Ventilation, Air Flow Design, Mine Haulage VentilationPseudoflow Algorithm, Hochbaum AlgorithmStope Design, Underground Mine Layout, Panel Design
Correlati333
SintesiMine ventilation is the design and operation of systems that deliver fresh air to underground mining areas and remove contaminated air, heat, and hazardous gases. It is critical for worker safety and productivity, maintaining breathable air (sufficient oxygen, low dust and gas concentrations) and acceptable temperatures. Proper ventilation design requires calculating heat loads from mining operations, determining required air volumes, and designing shaft/drift geometry to deliver adequate flow.The Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateInsieme di dati
  1. v1
  2. 2 Fonti
  3. PUBLISHED
  1. v1
  2. 2 Fonti
  3. PUBLISHED
  1. v1
  2. 2 Fonti
  3. PUBLISHED

Vai alla ricerca Scarica le diapositive

ScholarGateConfronta i metodi: Mine Ventilation · Pseudoflow · Stope Layout. Consultato il 2026-06-18 da https://scholargate.app/it/compare