Pianificazione di officina×Pianificazione dei Fabbisogni di Materiale×
CampoGestione delle operazioniGestione delle operazioni
FamigliaMachine learningMachine learning
Anno di origine20161975
IdeatorePinedo, M. L.Joseph Orlicky
TipoCombinatorial scheduling problemMaterial planning algorithm
Fonte seminalePinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗
Aliasjob scheduling, machine schedulingMRP, MRP I
Correlati55
SintesiJob shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
ScholarGateInsieme di dati
  1. v1
  2. 2 Fonti
  3. PUBLISHED
  1. v1
  2. 2 Fonti
  3. PUBLISHED

Vai alla ricerca Scarica le diapositive

ScholarGateConfronta i metodi: Job Shop Scheduling · Material Requirements Planning. Consultato il 2026-06-19 da https://scholargate.app/it/compare