ScholarGate
Assistente

Confronta i metodi

Esamina i metodi selezionati fianco a fianco; le righe che differiscono sono evidenziate.

Modello del Grado di Taglio di Lane×Indice di Lavoro di Bond×
CampoIngegneria minerariaIngegneria mineraria
FamigliaProcess / pipelineProcess / pipeline
Anno di origine19881952
IdeatoreK. F. LaneFred C. Bond
TipoEconomic optimization framework for ore classificationEmpirical method for grinding energy estimation
Fonte seminaleLane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Bond, F. C. (1952). The third theory of comminution. Transactions of the American Institute of Mining and Metallurgical Engineers, 193, 484-494. link ↗
AliasLane Model, Cut-off Grade Optimization, Lane's Optimization ModelBond Work Index, BWI, Bond Index Test
Correlati33
SintesiLane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.The Bond Work Index, introduced by Fred C. Bond in 1952, is an empirical parameter that characterizes the resistance of an ore to grinding in a tumbling mill. It is defined as the kilowatt-hours per short ton (kWh/st) of electrical energy required to reduce a coarse ore from theoretically infinite size to 80% passing 100 micrometers. The Bond Index is foundational in mineral processing plant design and cost estimation worldwide.
ScholarGateInsieme di dati
  1. v1
  2. 2 Fonti
  3. PUBLISHED
  1. v1
  2. 2 Fonti
  3. PUBLISHED

Vai alla ricerca Scarica le diapositive

ScholarGateConfronta i metodi: Cut-off Grade (Lane) · Bond Work Index. Consultato il 2026-06-18 da https://scholargate.app/it/compare