ScholarGate
Asisten

Bandingkan metode

Tinjau metode pilihan Anda berdampingan; baris yang berbeda akan disorot.

SMED×Pemeliharaan Produktif Total×
BidangManajemen OperasiManajemen Operasi
KeluargaMachine learningMachine learning
Tahun asal19851988
PencetusShigeo ShingoSeiichi Nakajima
TipeSetup time reduction techniqueMaintenance and productivity system
Sumber perintisShingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Cambridge, MA: Productivity Press. link ↗
Aliasquick changeover, rapid setupTPM
Terkait55
RingkasanSingle Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.Total Productive Maintenance (TPM) is a comprehensive maintenance management approach developed by Seiichi Nakajima in the late 1980s that emphasizes employee involvement, preventive maintenance, and continuous improvement to maximize equipment effectiveness. Unlike traditional reactive maintenance, TPM integrates maintenance activities across all organizational levels—from operators to executives—and focuses on eliminating losses (downtime, defects, speed losses) to achieve sustained production efficiency, quality, and safety.
ScholarGateSet data
  1. v1
  2. 2 Sumber
  3. PUBLISHED
  1. v1
  2. 2 Sumber
  3. PUBLISHED

Ke halaman pencarian Unduh salindia

ScholarGateBandingkan metode: SMED · Total Productive Maintenance. Diakses 2026-06-18 dari https://scholargate.app/id/compare