SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Forrásrekord
A hivatkozások szó szerint a módszer forrásrekordjából kerültek átvételre. Ezekből nem következtethető ki állítás-szintű ellenőrzés.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Kurált állítások
Az állítások a bizonyíték-jegyzőkönyvben tárolódtak, mindegyik saját értékeléssel.
Ez a nézet nem hoz létre állítás-értékelést, ha a jegyzőkönyvben nincs.
Kapcsolódó módszerek
A módszergráfból generálva és gépi javaslatú kapcsolatokként jelenítve meg – nem következtethető ki bizonyíték-állítás.