ScholarGate
Asszisztens

Módszerek összehasonlítása

Tekintse át a kiválasztott módszereket egymás mellett; az eltérő sorok kiemelve jelennek meg.

Rezonancia szinkron alatti×Egységkötelezettség×
TudományterületVillamosmérnöki tudományVillamosmérnöki tudomány
MódszercsaládProcess / pipelineProcess / pipeline
Keletkezés éve19771959
MegalkotóE. William Kimbark, Robert FarmerCharles J. Baldwin
TípusIdentification and mitigation of subsynchronous oscillations in AC systemsCombinatorial optimization for generator turn-on/turn-off scheduling
AlapműFarmer, R. G., Natel, B., & Schulz, R. P. (1977). The bushland event of September 10, 1977. IEEE Transactions on Power Apparatus and Systems, 96(4), 1315-1328. link ↗Baldwin, C. J., Dale, K. M., & Dittrich, R. F. (1959). A study of the economic shutdown of generating units in daily dispatch. AIEE Transactions, 78(3), 272-282. link ↗
Alternatív nevekSSR, Subsynchronous control interactions, Torsional oscillationsUC, Generator Commitment, Thermal Unit Scheduling
Kapcsolódó33
ÖsszefoglalóSubsynchronous Resonance (SSR) is a phenomenon where frequencies below the synchronous frequency (50/60 Hz) are amplified in power systems, causing oscillations that can damage turbines. First observed in Bushland, Texas in 1977, SSR results from interaction between series-compensated transmission lines and synchronous generators. Understanding and mitigating SSR is critical for stable grid operation, particularly with high levels of series compensation or power electronics.Unit Commitment (UC) is the problem of deciding which power generation units should be switched on or off over a planning horizon (typically 24-168 hours) to minimize total operating cost while meeting demand and reserve requirements. Introduced by Baldwin et al. in 1959, UC is a fundamental scheduling problem in power system operations, combining combinatorial optimization (which units to commit) with continuous optimization (optimal power output). UC remains one of the most important and computationally challenging problems in power systems.
ScholarGateAdatkészlet
  1. v1
  2. 3 Források
  3. PUBLISHED
  1. v1
  2. 3 Források
  3. PUBLISHED

Ugrás a kereséshez Diák letöltése

ScholarGateMódszerek összehasonlítása: Subsynchronous Resonance · Unit Commitment. Letöltve 2026-06-15, forrás: https://scholargate.app/hu/compare