ScholarGate
Assistant

Comparer des méthodes

Examinez les méthodes sélectionnées côte à côte ; les lignes qui diffèrent sont mises en évidence.

Modèle de seuil de teneur de Lane×Indice de travail de Bond×
DomaineGénie minierGénie minier
FamilleProcess / pipelineProcess / pipeline
Année d'origine19881952
Auteur d'origineK. F. LaneFred C. Bond
TypeEconomic optimization framework for ore classificationEmpirical method for grinding energy estimation
Source fondatriceLane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Bond, F. C. (1952). The third theory of comminution. Transactions of the American Institute of Mining and Metallurgical Engineers, 193, 484-494. link ↗
AliasLane Model, Cut-off Grade Optimization, Lane's Optimization ModelBond Work Index, BWI, Bond Index Test
Apparentées33
RésuméLane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.The Bond Work Index, introduced by Fred C. Bond in 1952, is an empirical parameter that characterizes the resistance of an ore to grinding in a tumbling mill. It is defined as the kilowatt-hours per short ton (kWh/st) of electrical energy required to reduce a coarse ore from theoretically infinite size to 80% passing 100 micrometers. The Bond Index is foundational in mineral processing plant design and cost estimation worldwide.
ScholarGateJeu de données
  1. v1
  2. 2 Sources
  3. PUBLISHED
  1. v1
  2. 2 Sources
  3. PUBLISHED

Aller à la recherche Télécharger les diapositives

ScholarGateComparer des méthodes: Cut-off Grade (Lane) · Bond Work Index. Consulté le 2026-06-18 sur https://scholargate.app/fr/compare