SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Lähdetietue
Sitaatit kopioitu sanatarkasti metodin lähdetietueesta. Niistä ei päätellä väitteiden tasoista varmennusta.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Kuratoituja väitteitä
Väitteet tallennettu todistusaineiston pääkirjaan, jokaisella oma arviointinsa.
Tämä näkymä ei keksi väitteen arviointia, jos pääkirjassa ei ole sitä.
Liittyvät metodit
Luotu metodigraafista ja näytetään koneen ehdottamina suhteina – väitteitä ei päätellä.