ScholarGate
Avustaja

Vertaile menetelmiä

Tarkastele valitsemiasi menetelmiä rinnakkain; eroavat rivit korostetaan.

Materiaalitarpeiden suunnittelu×SCOR-malli×SMED×
TieteenalaToimintojen johtaminenToimintojen johtaminenToimintojen johtaminen
MenetelmäperheMachine learningMachine learningMachine learning
Syntyvuosi197519961985
KehittäjäJoseph OrlickyPittiglio, Rabin, Todd & McGrathShigeo Shingo
TyyppiMaterial planning algorithmSupply chain reference frameworkSetup time reduction technique
AlkuperäislähdeOrlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Stewart, G. (1997). Supply chain operations reference model: SCOR, logistics information management, Vol. 10 No. 5, pp. 62-74. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
RinnakkaisnimetMRP, MRP Iquick changeover, rapid setup
Liittyvät555
TiivistelmäMaterial Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.The Supply Chain Operations Reference Model is a standardized framework for supply chain management developed by the Supply Chain Council (now APICS) in 1996. SCOR provides a structured approach to identify, evaluate, and improve supply chain processes across organizations, regardless of industry. It integrates planning, sourcing, manufacturing, delivery, and returns into a coherent operational model.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateAineisto
  1. v1
  2. 2 Lähteet
  3. PUBLISHED
  1. v1
  2. 2 Lähteet
  3. PUBLISHED
  1. v1
  2. 2 Lähteet
  3. PUBLISHED

Siirry hakuun Lataa diat

ScholarGateVertaile menetelmiä: Material Requirements Planning · SCOR Model · SMED. Haettu 2026-06-19 osoitteesta https://scholargate.app/fi/compare