SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Registro de origen
Citas copiadas textualmente del registro de origen del método. No se infiere ninguna verificación a nivel de afirmación de ellas.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Afirmaciones curadas
Afirmaciones persistidas en el libro mayor de evidencia, cada una con su propia evaluación.
Esta vista no inventa una evaluación de afirmación si el libro mayor no tiene ninguna.
Métodos relacionados
Generado a partir del grafo de métodos y mostrado como relaciones sugeridas por la máquina; no se infiere ninguna afirmación de evidencia.