Material Requirements Planning
Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
Source record
Citations copied verbatim from the method’s source record. No claim-level verification is inferred from them.
- Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. · URL
- APICS (2020). APICS Dictionary (16th ed.). Chicago: APICS. · URL
Curated claims
Claims persisted in the evidence ledger, each with its own assessment.
This view does not invent a claim assessment when the ledger has none.
Related methods
Generated from the method graph and shown as machine-suggested relations — no evidence claim is inferred.