SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Kilderegistrering
Citater kopieret ordret fra metodens kilderegistrering. Ingen påstandsniveauverifikation er udledt heraf.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Kuraterede påstande
Påstande gemt i bevis-loggen, hver med sin egen vurdering.
Denne visning opfinder ikke en påstandsvurdering, når loggen ingen har.
Relaterede metoder
Genereret fra metodegrafen og vist som maskinelt foreslåede relationer — ingen bevispåstand er udledt.