ScholarGate
Assistent

Sammenlign metoder

Gennemgå dine valgte metoder side om side; rækker, der afviger, er fremhævet.

Total Productive Maintenance×SMED×
FagområdeDriftsledelseDriftsledelse
FamilieMachine learningMachine learning
Oprindelsesår19881985
OphavspersonSeiichi NakajimaShigeo Shingo
TypeMaintenance and productivity systemSetup time reduction technique
Oprindelig kildeNakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Cambridge, MA: Productivity Press. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
AliasserTPMquick changeover, rapid setup
Relaterede55
ResuméTotal Productive Maintenance (TPM) is a comprehensive maintenance management approach developed by Seiichi Nakajima in the late 1980s that emphasizes employee involvement, preventive maintenance, and continuous improvement to maximize equipment effectiveness. Unlike traditional reactive maintenance, TPM integrates maintenance activities across all organizational levels—from operators to executives—and focuses on eliminating losses (downtime, defects, speed losses) to achieve sustained production efficiency, quality, and safety.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateDatasæt
  1. v1
  2. 2 Kilder
  3. PUBLISHED
  1. v1
  2. 2 Kilder
  3. PUBLISHED

Gå til søgning Hent slides

ScholarGateSammenlign metoder: Total Productive Maintenance · SMED. Hentet 2026-06-18 fra https://scholargate.app/da/compare