ScholarGate
Asistent

Porovnat metody

Prohlédněte si vybrané metody vedle sebe; řádky, které se liší, jsou zvýrazněny.

SMED×Celková produktivní údržba×
OborProvozní managementProvozní management
RodinaMachine learningMachine learning
Rok vzniku19851988
TvůrceShigeo ShingoSeiichi Nakajima
TypSetup time reduction techniqueMaintenance and productivity system
Původní zdrojShingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Cambridge, MA: Productivity Press. link ↗
Další názvyquick changeover, rapid setupTPM
Příbuzné55
ShrnutíSingle Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.Total Productive Maintenance (TPM) is a comprehensive maintenance management approach developed by Seiichi Nakajima in the late 1980s that emphasizes employee involvement, preventive maintenance, and continuous improvement to maximize equipment effectiveness. Unlike traditional reactive maintenance, TPM integrates maintenance activities across all organizational levels—from operators to executives—and focuses on eliminating losses (downtime, defects, speed losses) to achieve sustained production efficiency, quality, and safety.
ScholarGateDatová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 2 Zdroje
  3. PUBLISHED

Přejít na hledání Stáhnout prezentaci

ScholarGatePorovnat metody: SMED · Total Productive Maintenance. Získáno 2026-06-18 z https://scholargate.app/cs/compare