ScholarGate
Asistent

Porovnat metody

Prohlédněte si vybrané metody vedle sebe; řádky, které se liší, jsou zvýrazněny.

Vyvažování montážní linky×SMED×
OborProvozní managementProvozní management
RodinaMachine learningMachine learning
Rok vzniku20101985
TvůrceScholl, A.Shigeo Shingo
TypOptimization problemSetup time reduction technique
Původní zdrojScholl, A. (2010). Balancing and sequencing of assembly lines. Physica-Verlag. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
Další názvyline balancing, workload balancingquick changeover, rapid setup
Příbuzné55
ShrnutíAssembly Line Balancing is the problem of distributing a sequence of assembly tasks across a series of workstations on a production line such that work is evenly distributed, idle time is minimized, and throughput constraints are satisfied. The goal is to assign tasks to stations such that the total work time at each station is as equal as possible, optimizing for production rate (cycle time) and resource utilization. This is a classic optimization problem in manufacturing, solved through heuristic and exact algorithms, essential to the efficiency of mass production systems.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateDatová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 2 Zdroje
  3. PUBLISHED

Přejít na hledání Stáhnout prezentaci

ScholarGatePorovnat metody: Assembly Line Balancing · SMED. Získáno 2026-06-17 z https://scholargate.app/cs/compare