ScholarGate
Assistent

Compara mètodes

Revisa els mètodes seleccionats l'un al costat de l'altre; les files que difereixen es ressalten.

Optimització del Disseny de Talls×Algorisme de Lerchs-Grossmann×
CampEnginyeria de minesEnginyeria de mines
FamíliaProcess / pipelineProcess / pipeline
Any d'origen19601965
Autor originalMining Engineering PracticeHelmut Lerchs and Israel Grossmann
TipusOptimization framework for underground mine excavation designGraph-theoretic algorithm for pit limit optimization
Font seminalBrady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗
ÀliesStope Design, Underground Mine Layout, Panel DesignLerchs-Grossmann Method, LG Algorithm
Relacionats34
ResumStope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.
ScholarGateConjunt de dades
  1. v1
  2. 2 Fonts
  3. PUBLISHED
  1. v1
  2. 2 Fonts
  3. PUBLISHED

Ves a la cerca Baixa les diapositives

ScholarGateCompara mètodes: Stope Layout · Lerchs-Grossmann Algorithm. Recuperat el 2026-06-15 de https://scholargate.app/ca/compare