ScholarGate
Trợ lý

So sánh phương pháp

Xem các phương pháp đã chọn cạnh nhau; những hàng khác biệt được làm nổi bật.

Thuật toán Pseudoflow×Tối ưu hóa bố trí lò chợ×
Lĩnh vựcKỹ thuật mỏKỹ thuật mỏ
HọProcess / pipelineProcess / pipeline
Năm ra đời19921960
Người khởi xướngDorit S. HochbaumMining Engineering Practice
LoạiEfficient algorithm for maximum closure problemOptimization framework for underground mine excavation design
Công trình gốcHochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
Tên gọi khácPseudoflow Algorithm, Hochbaum AlgorithmStope Design, Underground Mine Layout, Panel Design
Liên quan33
Tóm tắtThe Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateBộ dữ liệu
  1. v1
  2. 2 Nguồn tài liệu
  3. PUBLISHED
  1. v1
  2. 2 Nguồn tài liệu
  3. PUBLISHED

Đến trang tìm kiếm Tải xuống bản trình chiếu

ScholarGateSo sánh phương pháp: Pseudoflow · Stope Layout. Truy cập ngày 2026-06-17 từ https://scholargate.app/vi/compare