SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Rekodi ya chanzo
Nukuu zimehamishwa kwa uhalisi kutoka kwa rekodi ya chanzo cha mbinu. Hakuna uthibitisho wa kiwango cha dai unaodokezwa kutoka kwao.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Madai yaliyotunzwa
Madai yamehifadhiwa katika daftari la ushahidi, kila moja ikiwa na tathmini yake.
Mwonekano huu haubuni tathmini ya dai wakati daftari haina yoyote.
Mbinu zinazohusiana
Zilizotengenezwa kutoka kwa grafu ya mbinu na kuonyeshwa kama uhusiano uliopendekezwa na mashine — hakuna dai la ushahidi linalodokezwa.