SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Regjistri burimor
Citimet kopjuar fjalë për fjalë nga regjistri burimor i metodës. Asnjë verifikim në nivel pretendimi nuk nënkuptohet prej tyre.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Pretendime të kuruaruara
Pretendimet e ruajtura në librin e dëshmive, secili me vlerësimin e vet.
Ky pamje nuk shpik një vlerësim pretendimi kur libri i dëshmive nuk ka asnjë.
Metoda të lidhura
Të gjeneruara nga grafiku metodologjik dhe të paraqitura si marrëdhënie të sugjeruara nga makina — asnjë pretendim dëshmie nuk nënkuptohet.