Bow-Tie Risk Analysis
Bow-tie risk analysis is a barrier-centred technique that places a single top event — the moment control over a hazard is lost — at the knot of a diagram, branches its possible causes to the left and its possible consequences to the right, and arrays along each pathway the barriers meant to prevent or mitigate it. The shape gives the method its name: the fanning threats and consequences form the two halves of a bow tie around the central event. de Ruijter and Guldenmund's 2016 review in Safety Science documents how the approach grew popular precisely because it combines, in one readable picture, the cause logic of a fault tree and the consequence logic of an event tree while foregrounding the controls that managers actually own. ISO/IEC 31010 lists bow-tie analysis among standard risk-assessment techniques, used both qualitatively to communicate risk and barrier coverage and quantitatively to estimate consequence likelihoods.
Lexoni metodën e plotë
Hyni me një llogari falas për ta lexuar këtë seksion.
Harta e metodave
Lagjja e metodave të lidhura — zgjidhni një nyje për të eksploruar.
Burimet
- de Ruijter, A., & Guldenmund, F. (2016). The bowtie method: A review. Safety Science, 88, 211-218. DOI: 10.1016/j.ssci.2016.03.001 ↗
- International Organization for Standardization. (2019). IEC 31010:2019 Risk management — Risk assessment techniques. ISO/IEC, Geneva. link ↗
Si ta citoni këtë faqe
ScholarGate. (2026, June 23). Bow-Tie Risk Analysis (Barrier-Centred Cause-Consequence Modeling). ScholarGate. https://scholargate.app/sq/disaster-studies/bow-tie-analysis
Cila metodë?
Vendoseni këtë metodë pranë të afërmeve të saj më të ngushta dhe lexojini krah për krah — biblioteka i shtron librat mbi tryezë; zgjedhja është e juaja.
- Analiza e Pemës së Ngjarjeve (ETA)Besueshmëria↔ krahaso
- Analiza Druri i Defektit (FTA)Besueshmëria↔ krahaso
- Preliminary Hazard AnalysisDisaster Studies↔ krahaso
Cituar nga
Metoda të ngjashme
Vutë re një problem në këtë faqe? Raportojeni ose sugjeroni një korrigjim →