ScholarGate
Asistenti

Krahasoni metodat

Shqyrtoni metodat e zgjedhura krah për krah; rreshtat që ndryshojnë janë të theksuar.

ELECTRE IV×Procesi Analitik i Rrjetit (AHP me kthim-lidhje dhe ndërvarësi)×
FushaVendimmarrjaVendimmarrja
FamiljaMCDMMCDM
Viti i origjinës19821996
KrijuesiRoy, B., Hugonnard, J. C.Saaty, T. L.
LlojiWeight-free outranking with pseudo-criteria (complete preorder)Weight_Subjective (pairwise comparison, supermatrix, network structure)
Burimi themeluesRoy, B., Hugonnard, J. C. (1982). Ranking of suburban line extension projects on the Paris metro system by a multicriteria method. Transportation Research Part A DOI ↗Saaty, T. L. (1996). Decision Making with Dependence and Feedback: The Analytic Network Process. RWS Publications, Pittsburgh ISBN: 0-9620317-9-8
Emërtime të tjera
Të lidhura88
PërmbledhjaELECTRE-IV (ELECTRE IV — ELimination Et Choix Traduisant la REalité IV (no criterion weights)) is a ranking multi-criteria decision-making (MCDM) method introduced by Roy, B., Hugonnard, J. C. in 1982. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.ANP (Analytic Network Process (AHP with feedback and interdependences)) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Saaty, T. L. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateSeti i të dhënave
  1. v1
  2. 1 Burimet
  3. PUBLISHED
  1. v1
  2. 1 Burimet
  3. PUBLISHED

Shko te kërkimi Shkarko diapozitivat

ScholarGateKrahasoni metodat: ELECTRE-IV · ANP. Marrë më 2026-06-17 nga https://scholargate.app/sq/compare