ScholarGate
Ассистент

Сравнение методов

Просматривайте выбранные методы рядом; строки с различиями подсвечены.

Карта контроля, основанная на оценке рисков×Шесть сигм DMAIC×
ОбластьПланирование экспериментаУправление качеством
СемействоProcess / pipelineProcess / pipeline
Год появления1956 (economic design); refined through 1980s–2000s2014
Автор методаA. J. Duncan (economic design, 1956); T. J. Lorenzen & L. C. Vance (unified economic model, 1986)Motorola; Pyzdek & Keller
ТипQuantitative process monitoring methodStructured process improvement methodology
Основополагающий источникLorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. DOI ↗Pyzdek, T., & Keller, P. (2014). The Six Sigma Handbook (4th ed.). McGraw-Hill. ISBN: 978-0-07-184053-9
Другие названияeconomic control chart, risk-integrated SPC, cost-based control chart, economic design of control chartsDMAIC Framework, Six Sigma Process Improvement Cycle, Define-Measure-Analyze-Improve-Control, Altı Sigma DMAIC
Связанные63
СводкаA risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.Six Sigma DMAIC is a data-driven, five-phase process improvement methodology — Define, Measure, Analyze, Improve, and Control — used to reduce defects and process variation to fewer than 3.4 defects per million opportunities. Originating at Motorola in the 1980s and systematized by practitioners including Pyzdek and Keller, it is widely adopted in manufacturing, healthcare, finance, and service industries seeking sustained quality gains.
ScholarGateНабор данных
  1. v1
  2. 2 Источники
  3. PUBLISHED
  1. v1
  2. 1 Источники
  3. PUBLISHED

Перейти к поиску Скачать слайды

ScholarGateСравнение методов: Risk-based control chart · Six Sigma DMAIC. Получено 2026-06-18 из https://scholargate.app/ru/compare