ScholarGate
Asystent

Porównaj metody

Przeglądaj wybrane metody obok siebie; wiersze, które się różnią, są wyróżnione.

Gospodarowanie wodami opadowymi×Ocena oddziaływania na środowisko×
DziedzinaInżynieria środowiskaInżynieria środowiska
RodzinaProcess / pipelineProcess / pipeline
Rok powstania19801970
TwórcaUrban hydrologists and engineersU.S. National Environmental Policy Act (NEPA)
Typdesign and simulation pipelinesystematic assessment and decision-support pipeline
Źródło pierwotneUrbonas, B., & Stahre, P. (1993). Stormwater Best Management Practices and Detention. Prentice Hall. ISBN: 978-0134445915Glasson, J., Therivel, R., & Chadwick, A. (2005). Introduction to Environmental Impact Assessment (3rd ed.). Routledge. ISBN: 978-0415303910
Inne nazwyurban stormwater, runoff management, wet weather control, low-impact developmentEIA, impact assessment, environmental screening, cumulative effects assessment
Pokrewne34
PodsumowanieStormwater management is the planning and engineering of urban water systems to control, treat, and utilize rainwater runoff from developed areas. Traditional approaches (pipes, detention basins) conveyed runoff rapidly to streams or treatment plants; modern green infrastructure approaches (permeable pavements, bioswales, retention ponds) reduce runoff volume through infiltration and reuse while improving water quality. Stormwater management integrates hydrologic modeling, water quality assessment, and infrastructure design to meet regulatory requirements and climate resilience goals.Environmental Impact Assessment (EIA) is a systematic, structured process to identify, predict, and evaluate the environmental and social consequences of proposed development projects (infrastructure, extraction, manufacturing) before implementation. Mandated by law in most jurisdictions since the 1970s (NEPA in USA, EU Directive 2011/92/EU), EIA integrates scientific analysis of air quality, water resources, biodiversity, noise, and socioeconomic effects with stakeholder consultation and decision-making frameworks to inform project approval, design modification, or rejection.
ScholarGateZbiór danych
  1. v1
  2. 3 Źródła
  3. PUBLISHED
  1. v1
  2. 3 Źródła
  3. PUBLISHED

Przejdź do wyszukiwania Pobierz slajdy

ScholarGatePorównaj metody: Stormwater Management · Environmental Impact Assessment. Pobrano 2026-06-19 z https://scholargate.app/pl/compare