ScholarGate
Assistent

Methoden vergelijken

Bekijk de geselecteerde methoden naast elkaar; rijen die verschillen zijn gemarkeerd.

Pseudoflow-algoritme×Optimalisatie van Stope Layout×
VakgebiedMijnbouwkundeMijnbouwkunde
FamilieProcess / pipelineProcess / pipeline
Jaar van ontstaan19921960
GrondleggerDorit S. HochbaumMining Engineering Practice
TypeEfficient algorithm for maximum closure problemOptimization framework for underground mine excavation design
Oorspronkelijke bronHochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
AliassenPseudoflow Algorithm, Hochbaum AlgorithmStope Design, Underground Mine Layout, Panel Design
Verwant33
SamenvattingThe Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateGegevensset
  1. v1
  2. 2 Bronnen
  3. PUBLISHED
  1. v1
  2. 2 Bronnen
  3. PUBLISHED

Naar zoeken Dia's downloaden

ScholarGateMethoden vergelijken: Pseudoflow · Stope Layout. Geraadpleegd op 2026-06-17 via https://scholargate.app/nl/compare