ScholarGate
Assistent

Methoden vergelijken

Bekijk de geselecteerde methoden naast elkaar; rijen die verschillen zijn gemarkeerd.

Complex Proportional Assessment×CIMAS×
VakgebiedBesluitvormingBesluitvorming
FamilieMCDMMCDM
Jaar van ontstaan19962025
GrondleggerZavadskas, E. K., Kaklauskas, A.Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N.
TypeProportional assessment (benefit/cost split)Impact-based weighted scoring (criterion-level deviation analysis)
Oorspronkelijke bronZavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. (2025). A New Criteria Importance Assessment (CIMAS) Method in Multi-Criteria Group Decision-Making: Criteria Evaluation for Supplier Selection. FACTA UNIVERSITATIS — Series: Mechanical Engineering DOI ↗
Aliassen
Verwant88
SamenvattingCOPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.CIMAS (Criterion Impact MeAsurement System) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. in 2025. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateGegevensset
  1. v1
  2. 1 Bronnen
  3. PUBLISHED
  1. v1
  2. 1 Bronnen
  3. PUBLISHED

Naar zoeken Dia's downloaden

ScholarGateMethoden vergelijken: COPRAS · CIMAS. Geraadpleegd op 2026-06-17 via https://scholargate.app/nl/compare