Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
Avota reģistrs
Atsauces kopētas tieši no metodes avota reģistra. Tās nenozīmē nekādu apgalvojumu līmeņa verifikāciju.
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
Kurēti apgalvojumi
Apgalvojumi saglabāti pierādījumu reģistrā, katram ar savu novērtējumu.
Šis skatījums neizgudro apgalvojumu novērtējumu, ja reģistrā tā nav.
Saistītās metodes
Ģenerēts no metodes grafika un parādīts kā mašīnas ieteiktas attiecības — netiek izvirzīts neviens pierādījumu apgalvojums.