Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
Catatan sumber
Kutipan disalin apa adanya dari catatan sumber metode. Tidak ada verifikasi tingkat klaim yang disimpulkan darinya.
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
Klaim yang dikurasi
Klaim tersimpan dalam buku besar bukti, masing-masing dengan penilaiannya sendiri.
Tampilan ini tidak menciptakan penilaian klaim ketika buku besar tidak memilikinya.
Metode terkait
Dihasilkan dari grafik metode dan ditampilkan sebagai relasi yang disarankan mesin — tidak ada klaim bukti yang disimpulkan.