ScholarGate
Asisten

Bandingkan metode

Tinjau metode pilihan Anda berdampingan; baris yang berbeda akan disorot.

Model Tingkat Batas Lane×Algoritma Lerchs-Grossmann×
BidangTeknik PertambanganTeknik Pertambangan
KeluargaProcess / pipelineProcess / pipeline
Tahun asal19881965
PencetusK. F. LaneHelmut Lerchs and Israel Grossmann
TipeEconomic optimization framework for ore classificationGraph-theoretic algorithm for pit limit optimization
Sumber perintisLane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗
AliasLane Model, Cut-off Grade Optimization, Lane's Optimization ModelLerchs-Grossmann Method, LG Algorithm
Terkait34
RingkasanLane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.
ScholarGateSet data
  1. v1
  2. 2 Sumber
  3. PUBLISHED
  1. v1
  2. 2 Sumber
  3. PUBLISHED

Ke halaman pencarian Unduh salindia

ScholarGateBandingkan metode: Cut-off Grade (Lane) · Lerchs-Grossmann Algorithm. Diakses 2026-06-17 dari https://scholargate.app/id/compare