ScholarGate
Asisten

Bandingkan metode

Tinjau metode pilihan Anda berdampingan; baris yang berbeda akan disorot.

Penilaian Proporsional Kompleks×Varian Fuzzy Gambar dari CIMAS (Kara et al. 2024)×
BidangPengambilan KeputusanPengambilan Keputusan
KeluargaMCDMMCDM
Tahun asal19962024
PencetusZavadskas, E. K., Kaklauskas, A.Kara, K., Yalçın, G. C., Kaygısız, E. G., Simic, V., Örnek, A. Ş., Pamucar, D.
TipeProportional assessment (benefit/cost split)Picture Fuzzy criteria weighting via expert assessment (CIMAS) — PFWA aggregation
Sumber perintisZavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗Kara, K., Yalçın, G. C., Kaygısız, E. G., Simic, V., Örnek, A. Ş., Pamucar, D. (2024). A picture fuzzy CIMAS-ARTASI model for website performance analysis in human resource management. Applied Soft Computing DOI ↗
Alias
Terkait88
RingkasanCOPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.PIF-CIMAS (Picture Fuzzy variant of CIMAS (Kara et al. 2024)) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Kara, K., Yalçın, G. C., Kaygısız, E. G., Simic, V., Örnek, A. Ş., Pamucar, D. in 2024. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateSet data
  1. v1
  2. 1 Sumber
  3. PUBLISHED
  1. v1
  2. 1 Sumber
  3. PUBLISHED

Ke halaman pencarian Unduh salindia

ScholarGateBandingkan metode: COPRAS · PIF-CIMAS. Diakses 2026-06-19 dari https://scholargate.app/id/compare